AIRZONE - FIXED

This build was completed in October, allowing the school to extend the periods of outdoor comfort it can offer its students during social distancing, and will last for decades to come throughout the history of the school.

The Lincoln Castle Academy came to Shade Zone looking for some kind of school shelter for their playground. They originally asked for one playground canopy but after getting some advice from our expert installers and project managers, opted for seven in three different areas of the school outdoor areas. These school canopies are very cost-effective, covering large areas with easy maintenance. After having issues with another company for their groundwork, Shade Zone was able to provide an all-inclusive package that included ground work and fixed all of their woes.

Lincoln Castle Academy knew what they wanted, but needed a helping hand in getting the idea off the ground to improve their school outdoor areas. Shade Zone was able to advise on the best placements on the school canopies so that the students and staff could get the most out of them.

Shade Zone kept the entire process hassle-free for the client by finding the solutions to drainage and guttering – which came as a staple feature on the products chosen. We also advised the colour scheme of the playground canopies to match the school aesthetic and their own colour scheme. To keep disruption at a minimum, Shade Zone completed all works during half term. Overall, Shade Zone is happy to add another satisfied client to the rosters.

Previous
Previous

MED QUADRA - RETRACTABLE

Next
Next

LOUVERED